Abstrak
PT. Graha Karya Perkasa is a company engaged in the construction and infrastructure sector, so it requires an appropriate decision-making process in determining which projects should be prioritized. This study aims to determine the priority order of three projects, namely the construction of the MBG Warehouse, the construction of the Flyover Bridge, and the construction of the Dam using the Weighted Product (WP) method. The assessment is carried out based on three main criteria, namely cost, duration, and quality. Research data was obtained through interviews with project heads and available planning documents. Based on the results of calculations using the Weighted Product method, the Flyover Bridge project is the project with the highest priority value, followed by the MBG Warehouse and the Dam. The Weighted Product method has been proven to be able to provide objective results in the process of determining project priorities.
Referensi
Cinnong, A. A., Hamdi, F., & Latif, S. (2025). Strategic role of human resource quality in construction management effectiveness: A literature review. Jurnal LINEARS, 8(2), 89–98. https://doi.org/10.26618/21cks985
Felani, R. O., Wicaksono, A. A., & Aminah, S. (2025). Implementasi metode weighted product dalam sistem pendukung keputusan pemilihan mata kuliah kelas TI semester 4. SUDO Jurnal Teknik Informatika, 4(2), 104-111. https://doi.org/10.56211/sudo.v4i2.948
Haffandi, M. Y., & Hendrik, B. (2024). Analisa metode sistem pendukung keputusan dalam konteks perusahaan: Systematic literature review. Journal of Education Research, 5(4), 6463–6471. https://doi.org/10.37985/jer.v5i4.1959
Jafarzadeh, H., Heidary Dahooie, J., Akbari, P., & Qorbani, A. (2022). A project prioritization approach considering uncertainty, reliability, criteria prioritization, and robustness. Decision Support Systems, 156, 113731. https://doi.org/10.1016/j.dss.2022.113731
Kayvanfar, V., Elomri, A., Kerbache, L., Vandchali, H. R., & El Omri, A. (2024). A review of decision support systems in the internet of things and supply chain and logistics using web content mining. Supply chain analytics, 6, 100063. https://doi.org/10.1016/j.sca.2024.100063
Pratiwi, M. P., Fauzi, R., Hutabri, E., & Muharmi, Y. (2025). Penerapan weighted product (WP) dalam sistem pendukung keputusan pemetaan pemilihan rumah baru. Jurnal Nasional Ilmu Komputer, 6(1), 19–29. https://doi.org/10.47747/jurnalnik.v6i1.2644
Sihombing, D. J. C. (2023). Application of the weighted product method for prioritizing construction projects. Jurnal Lebesgue: Jurnal Ilmiah Pendidikan Matematika, Matematika dan Statistika, 4(3), 1837-1845. https://doi.org/10.46306/lb.v4i3.483
Sugiri, T., & Sari, D. Y. (2025, March). Sikap tenaga kerja konstruksi terhadap sertifikasi kompetensi kerja di Provinsi Jawa Barat. In Prosiding TAU SNARS-TEK Seminar Nasional Rekayasa dan Teknologi (Vol. 5, No. 1, pp. 79-86).
Universitas Negeri Surabaya. (2025). Sistem penunjang keputusan: Pengertian, komponen, dan manfaat dalam pengambilan keputusan. Retrieved December 16, 2025, from https://si.ft.unesa.ac.id/post/sistem-pendukung-keputusan-pengertian-komponen-dan-manfaat-dalam-pengambilan-keputusan
Yoon, K. P. (1989). Multiple attribute decision making: Methods and applications. Springer.

Artikel ini berlisensiCreative Commons Attribution-ShareAlike 4.0 International License.
Hak Cipta (c) 2026 Siti Azzahra