Using the Expected Monetary Value (EMV) Method to Minimize Risk in Project Decision Making

Main Article Content

Lokot Muda Harahap
Christin Lestari Sinaga
Devi Aprilia Lubis
Muhammad Akbar Sampurno
Natasyah Nelfita

Abstract

Effective decision making is key to achieving project success. Risk is always present in managing projects and can significantly impact the final outcome. The Expected Monetary Value (EMV) method is an important tool in managing project risk. EMV is used to calculate the monetary value of the various possible outcomes of a decision or series of decisions. In the context of project decision making, EMV helps project managers to estimate the monetary value of the risks associated with various decisions to be taken during the project cycle. This research uses a literature review type of study and the review model chosen is a narrative review. This research was conducted using a narrative review model. The research method used is secondary data collected from various international journals, papers, and previous research papers used as data sources and analyzed by the author taking into account the problems considered in this research.

Article Details

How to Cite
Harahap, L. M., Sinaga, C. L., Lubis, D. A., Sampurno, M. A., & Nelfita, N. (2023). Using the Expected Monetary Value (EMV) Method to Minimize Risk in Project Decision Making. Economic: Journal Economic and Business, 2(4), 131–135. https://doi.org/10.56495/ejeb.v2i4.593
Section
Articles

References

Arafat, L. O. M. Y. (2019). Project risk management information system at CV. Artha Jaya. Jurnal Ilmiah Komputer dan Informatika, 6.

Pasolong, H. (2023). Teori pengambilan keputusan. Bandung: Alfabeta Bandung.

Rita'i, M. (2020). Pengambilan keputusan. Jakarta: Kencana.

Sampe, F. (2023). Manajemen risiko. Banten: PT Sada Kurnia Pustaka.

Sari, E. (2016). Analisis resiko proyek pada pekerjaan jembatan Sidamukti Kadu di Majalengka dengan metode FMEA dan decision tree. Jurnal J-Ensitec, 43.

Theotista, G. (2023). Development of expected monetary value using binomial state price in determining stock investment decisions. Jurnal Ilmu Matematika dan Terapan, 2.

Varian, A. R. (2019). Sistem informasi penjadwalan dan manajemen risiko proyek menggunakan critical path method dan expected monetary value di PT. Adyawinsa Telecommunication & Electrical. Jurnal Ilmiah Komputer dan Informatika, 7.

Yudhaningsih, K. (2022). Analisis risiko proyek pada konstruksi bangunan: Tinjauan literatur. Journal of Industrial and Engineering System (JIES), 33.

Most read articles by the same author(s)